Issue |
MATEC Web Conf.
Volume 170, 2018
International Science Conference SPbWOSCE-2017 “Business Technologies for Sustainable Urban Development”
|
|
---|---|---|
Article Number | 01004 | |
Number of page(s) | 8 | |
Section | Municipal Facilities Management. Business Activity Management in Construction. Process Reengineering and Information Systems | |
DOI | https://doi.org/10.1051/matecconf/201817001004 | |
Published online | 13 June 2018 |
Accelerator of innovations for pre-incubation stage of project lifecycle
Peter the Great Saint-Petersburg Polytechnic University, 29, Polytechnicheskaya, 195251, Saint-Petersburg, Russia
* Corresponding author: yury.nurulin@gmail.com
The article is aimed at developing cogent proposals to shorten the implementation of pre-incubation stage of the innovation lifecycle. To achieve the goal, we proposed a framework to formalized description of innovative systems that allowed us to identify structure and set of elements of the system that are invariant with respect to its levels. The analysis of the most popular innovation process models allowed us to single out the feedback as a key structural element of the system, which to a large extent determines the dynamics of the innovation process. It is shown that the absence of specialized infrastructural elements of innovation systems that could provide cross-cutting feedback at the pre-incubation stage is a deterrent to accelerate innovation.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.