Research on Systematic Design and Installation Based on Explosion Protection Technology Combined with Traction Elevator
1
Tianjin University, Tianjin, China, 300072 ;
2
Zhejiang Machinery Industry Information Research Institute, Zhejiang, China, 310009
a Corresponding author: 43410697@qq.com
According to GB, NEC, ASME17.1, ANSI A10.4 and EN 81.1 standard, there is a danger of explosive gas or dust. And then for elevator explosion protection, we design a device type up to requirements of NEC Class 1, Division 1, Group C&D as well as NEC Class 1, Division 2. It is also a controllable device type working well in highly explosive and hazardous work areas. We keep the GEDA explosion-proof lift fully fixed to protect workers and materials to the maximum extent. In addition, explosion-proof elevators in China must meet the standards of GB3836.1/2, GB50257, GB7588, etc. Combining the engineering practice over the years, the authors put forward in this paper a method of design and development as well as components based on explosion protection combined with traction elevator, which opens a new window for the systematic design and installation optimization of explosion-proof elevator.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.