Issue |
MATEC Web Conf.
Volume 154, 2018
The 2nd International Conference on Engineering and Technology for Sustainable Development (ICET4SD 2017)
|
|
---|---|---|
Article Number | 01102 | |
Number of page(s) | 4 | |
Section | Engineering and Technology | |
DOI | https://doi.org/10.1051/matecconf/201815401102 | |
Published online | 28 February 2018 |
Risk control analysis of a furniture production activities using hazard identification and risk assessment method
Industrial Engineering, Universitas Islam Indonesia, Yogyakarta, Indonesia
* Corresponding author: atyanti.dyah@uii.ac.id
The furniture industry in Indonesia is growing rapidly that leads to technological development. But the use of technology in the industry creates some risk to worker safety. The number of work accidents in Indonesia at the end of 2016 is relatively high. Therefore, this research is conducted to identify hazards and determine risk control using hazard identification and risk assessment method (HIRA). There are three main stages, i.e. identify and analyze hazards, classify hazards and risk control. The result shows that there are nine potential hazards in furniture production, 22% of it is categorized as high risk level, i.e. hand slashed and fingers cut by machine. Three types of risk control activities are determined to minimize the risk, i.e. administration and engineering control and personal protective equipment.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.