Issue |
MATEC Web Conf.
Volume 154, 2018
The 2nd International Conference on Engineering and Technology for Sustainable Development (ICET4SD 2017)
|
|
---|---|---|
Article Number | 01095 | |
Number of page(s) | 4 | |
Section | Engineering and Technology | |
DOI | https://doi.org/10.1051/matecconf/201815401095 | |
Published online | 28 February 2018 |
Implementation of lean manufacturing to reduce waste in production line with value stream mapping approach and Kaizen in division sanding upright piano, case study in: PT. X
Industrial Department, Universitas Islam Indonesia, Jl. Kaliurang, Km 14.5, Yogyakarta, Indonesia
* Corresponding author: wijiagungsantosa@icloud.com
PT. XY produces musical instruments such as Upright Pianos and Grand Pianos. Due to a competitive competition, a good quality product is highly required as well as increasing the production scale. To achieve these objectives, company needs to reduce wastes occurred in its production lines, particularly in the division of sanding panel upright piano (UP) which produces type of PE B1 pianos. High cycle time and lead-time are caused by wastes in UP panel sanding division. Therefore, it is needed improvements to be applied here so that the production lines will be run more effectively and efficiently. This study aims to identify wastes using Value Stream Mapping (VSM) as a tool of lean manufacturing and to implement the improvements using Kaizen. It is found that the wastes are motion and waiting. Furthermore, the improvements (kaizen) are focused on reducing motion and waiting wastes. It is shown that cycle time decreased from 51.16 minutes to 41.90 minutes, work in process or inventory can be reduced to 24 pcs over 32 pcs, and the lead-time is 0.167 days of 0.222 days.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.