Issue |
MATEC Web Conf.
Volume 154, 2018
The 2nd International Conference on Engineering and Technology for Sustainable Development (ICET4SD 2017)
|
|
---|---|---|
Article Number | 01079 | |
Number of page(s) | 6 | |
Section | Engineering and Technology | |
DOI | https://doi.org/10.1051/matecconf/201815401079 | |
Published online | 28 February 2018 |
Fuel distribution process risk analysis in East Borneo
Industrial Engineering, Universitas Islam Indonesia, Yogyakarta, 55584, Indonesia
* Corresponding author: 13522169@students.uii.ac.id
Fuel distribution is an important aspect of fulfilling the customer’s need. It is risky because it can cause tardiness that can cause fuel scarcity. In the process of distribution, many risks are occurring. House of Risk is a method used for mitigating the risk. It identifies seven risk events and nine risk agents. Matrix occurrence and severity are used for eliminating the minor impact risk. House of Risk 1 is used for determining the Aggregate Risk Potential (ARP). Pareto diagram is applied to prioritize risk that must be mitigated by preventive actions based on ARP. It identifies 4 priority risks, namely A8 (Car trouble), A4 (Human Error), A3 (Error deposit via bank and underpayment), and A6 (traffic accident) which should be mitigated. House of Risk 2 makes for mapping between the preventive action and risk agent. It gets the Effectiveness to Difficulty Ratio (ETD) for mitigating action. Conducting safety talk routine once every three days with ETD 2088 is the primary preventive actions.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.