Issue |
MATEC Web Conf.
Volume 154, 2018
The 2nd International Conference on Engineering and Technology for Sustainable Development (ICET4SD 2017)
|
|
---|---|---|
Article Number | 01067 | |
Number of page(s) | 5 | |
Section | Engineering and Technology | |
DOI | https://doi.org/10.1051/matecconf/201815401067 | |
Published online | 28 February 2018 |
Evaluation of SME (Small Medium Enterprise) production system with discrete system simulation method
Department of Industrial Engineering, Faculty of Industrial Technology, Indonesia
* Corresponding author: 15522226@students.uii.ac.id
Like manufacturing companies that have flowshop production lines, SME facing the amount of flow time and makespan. Unfulfilled production targets, buildup on some machines that result in other machines being idle, increasing waiting times across multiple machines, and poor performance of workers are a series of problems facing SME. This article uses a discrete system simulation method to analyze and evaluate SME production lines to improve performance. Simulation is an appropriate tool used when experiments are needed in order to find the best response from system components. From the results of modeling and simulation done found the root of the problem is due to accumulation that occurs in one machine and the lack of utility of the operator in producing bags. So do the experimental design with 3 scenarios on the system that have been modeled and obtained some solutions that can be offered to solve the problem. Furthermore, after the alternative selection is obtained the best scenario based on the alternative selection test is the scenario3 by adding 2 new machines and 1 new operator on the production line obtained a significant output increase compared to other scenarios of approximately 30%. While the best scenario based on the minimum cost is the scenario2 by adding 2 new operators obtained output that is not much different than the scenario3. However, it has not been able to solve a series of problems facing SME. Therefore, the results of this study to solve a series of problems faced by SME is to add facilities in the production line of 2 new machines and 1 operator (scenario3).
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.