Building informational model management automation
Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow, 129337, Russia
* Corresponding author: chelyshkovpd@mgsu.ru
This paper describes the approaches to analysis in order to optimize the construction facilities (buildings and complexes) information models management. Two criteria have been proposed and discussed for the model quality evaluation: model informational saturation criterion and model topicality criterion. Practical application of the first criterion enables to define the optimal plan of information model filling. Herewith, the optimization is carried out through the maximum volume of useful information. The criterion is used at all stages of the model life cycle during the course of the model data updating. The second criterion allows to evaluate the need in the model data update. Being a vector (in the space of the modelling object significant values) of deviation of the model data from the model object data, the criterion represents the need to initiate the model data updating procedure using the predefined rules
© The Authors, published by EDP Sciences, 2018
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.