Issue |
MATEC Web Conf.
Volume 251, 2018
VI International Scientific Conference “Integration, Partnership and Innovation in Construction Science and Education” (IPICSE-2018)
|
|
---|---|---|
Article Number | 03028 | |
Number of page(s) | 5 | |
Section | Engineering and Smart Systems in Construction | |
DOI | https://doi.org/10.1051/matecconf/201825103028 | |
Published online | 14 December 2018 |
Classification and determination of working area of concrete placing booms
Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow, 129337, Russia
* Corresponding author: KoshkarevEV@mgsu.ru
A concrete placing boom is the final element of concrete mixture pipeline transportation system. It is designed to deliver the concrete mixture for discharging where and when required, therefore, similar to cranes, it must be equipped with at least two mechanisms: boom extension and rotation. The mechanisms can be both manually and hydraulically actuated, hence, booms are differentiated between mechanical (manually controlled) and hydraulically or electrically controlled. This article aims at describing the areas for using various categories of concrete placing booms.
© The Authors, published by EDP Sciences, 2018
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.