A glimpse of horizontal directional drilling productivity factors
1
Department of Civil Engineering, Faculty of Engineering, Universiti Putra Malaysia, 43400 - UPM Serdang, Selangor Darul Ehsan, Malaysia
2
Centre For Continuing Education (CCE), Universiti Sultan Zainal Abidin, Gong Badak, 21300 - Kuala Terengganu, Terengganu, Malaysia
3
Malaysian Highway Authority, Jalan Serdang -Kajang, Kawasan Institusi Bangi, 43000 - Bandar Baru Bangi, Selangor, Malaysia
* Corresponding author: norizam32@yahoo.com.my
Horizontal Directional Drilling (HDD) is a trenchless technology provides an installation alternative that offers a lot of benefit compared to traditional open-cut method. It’s called HDD because its steering ability to avoid existing utilities or other obstacles either horizontally, vertically and even pulled back where she got its name. HDD was developed in California in the 1970s and was introduced in Europe in 1986. Since year 1992 up to 2016 there are about 40 thousand unit HDD machine were sold worldwide. Contractors, consultants, municipalities and decision makers are always in difficulties to determine the installation cost and the duration required when using the HDD method due to the presence of many qualitative factors. Understanding the HDD productivity factors will assist the stakeholders to overcome this matter. The aims of this study are to identify the existing HDD productivity factors, identify the factors that affect HDD productivity, identify the current tools that are used by current researcher, and identify the open problems and areas related to HDD productivity for improvement. Systematic Literature Review (SLR) was carried to previous related papers retrieved by a manual search, critically analysed and discussed. Researches regarding HDD productivity conducted by previous researchers were compared and discussed. The studies involved journal articles, conference papers, books, guidelines and etc. Consequently, these previous experiences and models can assist the contractors, consultants, municipalities and decision makers in preparing their costing and scheduling. The lacking factors on HDD productivity factors were highlighted and suggested for futre studies.
© The Authors, published by EDP Sciences, 2018
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.