Issue |
MATEC Web Conf.
Volume 246, 2018
2018 International Symposium on Water System Operations (ISWSO 2018)
|
|
---|---|---|
Article Number | 01032 | |
Number of page(s) | 4 | |
Section | Main Session: Water System Operations | |
DOI | https://doi.org/10.1051/matecconf/201824601032 | |
Published online | 07 December 2018 |
Simulation and Analysis of Accident Condition and Coping Operations of The Dian Zhong Water Diversion Project
1 Changjiang Institute of Survey, Planning, Design and Research, Wuhan, Hubei, China
* Corresponding author:
a Yibo Yan: yanyibo@cjwsjy.com.cn
In this paper, according to the characteristics of Dian Zhong Water Diversion Project, as big flow, small cross section, and insufficient escaping capacity, a numerical model of the project is developed. In addition, with analysis, a worst accident condition and operations dealing with it are developed and simulated by the numerical model. With the simulation results, a checking condition is suggested to the structure design.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.