Operation experience of solar power plants connected to the Russian distributed grid
1
JSC «STC UPS», 194223 St.Petersburg, 1, lit A, Kurchatov Str., Russia
2
Peter the Great St. Petersburg Polytechnic University, 29 Politekhnicheskaya street, 195251, Saint Petersburg, Russia
* Corresponding author: enpopkov@gmail.com
The islanding condition of grid-tied solar power plant with hydro power plant of commensurable power is considered in this article. Based on the results of the article, the relevant conclusions were drawn.
© The Authors, published by EDP Sciences, 2018
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.