Issue |
MATEC Web Conf.
Volume 145, 2018
NCTAM 2017 – 13th National Congress on Theoretical and Applied Mechanics
|
|
---|---|---|
Article Number | 05015 | |
Number of page(s) | 10 | |
Section | Non-destructive testing | |
DOI | https://doi.org/10.1051/matecconf/201814505015 | |
Published online | 09 January 2018 |
Ageing management in NPP. Effectiveness of the methods for control, examination and monitoring in relation to mechanisms of degradation of mechanical properties
Kozloduy NPP EAD, ICC-DCC, 3321 Kozloduy, Bulgaria
* Corresponding author: gdimova@npp.bg
This paper describes ageing management activities for Long Term Operation (LTO) of components of Kozloduy NPP EAD. The stages of LTO Project are: Stage 1 - implementing a comprehensive assessment of the actual condition of the equipment; Stage 2 - providing of a Complex Analysis; Stage 3 – licensing of Plant Life Extension (PLEX) for long-term operation (LTO). The main activities are assessment of actual condition of the equipment and building; review of methods for control (non-destructive), examination and monitoring; assessment of effectiveness of methods; necessity of additional control/ examination/ service. The paper describes some mechanisms of degradation of mechanical properties, methods for control and criterions for their effectiveness.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.