Issue |
MATEC Web Conf.
Volume 142, 2018
International Conference on Materials Applications and Engineering 2017 (ICMAE2017)
|
|
---|---|---|
Article Number | 02007 | |
Number of page(s) | 6 | |
Section | Building Materials and Properties | |
DOI | https://doi.org/10.1051/matecconf/201814202007 | |
Published online | 08 January 2018 |
Preparation of Magnesium Phosphate Cement and Application in Concrete Repair
School of Civil Engineering, Qinghai University, 810016, Xining, China
* Corresponding author: wuchengyou86@163.com
Potassium magnesium phosphate cement (MKPC) was prepared by using magnesium oxide (MgO) and potassium dihydrogen phosphate (KH2PO4, KDP). The effects of different calcination temperature, water-cement ratio and ratio on the operation of magnesium phosphate cement were studied. The effects of different water - cement ratio and ratio on the bonding strength of potassium magnesium phosphate cement and the application of potassium phosphate and magnesium cement in concrete repair and reinforcement were determined by experiments such as bending resistance, splitting, compression and bearing capacity. The experimental results show that the calcination temperature is 1100 °C, the calcination time is 1h, the settling time of magnesium oxide is 39min, and the compressive strength of one day reaches 53MPa. The water - cement ratio with the best bonding strength is 0.2, the mass ratio is 2:1.To meet the rapid repair of the construction requirements, is expected to be applied to the actual repair works.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.