Issue |
MATEC Web Conf.
Volume 127, 2017
The 11th International Conference on Axiomatic Design (ICAD 2017)
|
|
---|---|---|
Article Number | 01018 | |
Number of page(s) | 6 | |
DOI | https://doi.org/10.1051/matecconf/201712701018 | |
Published online | 09 October 2017 |
Adapt! – Agile Project Management Supported by Axiomatic Design
1 Daimler AG, Process Development and Materials Department, 71059 Sindelfingen, Germany
2 Universität der Bundeswehr, Institut für Technische Produktentwicklung, 85577 Neubiberg, Germany
⁎ Corresponding author: jakob.weber@daimler.com
This paper presents a novel approach for the use of Axiomatic Design Theory in combination with agile project management methods like Scrum for an effective, structured and combined product design and development process. Agile project management methods give a guideline how to manage a project, but there is only minor assistance regarding the actual product development process itself. Axiomatic Design can be used to support these methods in this point. In concrete terms, the results of the decomposition process of this theory can be used to formulate and structure the work packages for the agile project managing process. The Independence Axiom of Axiomatic Design Theory has a substantial contribution by ensuring the independence of the work packages which can be assigned to different project team members and can be processed independently by them. The combination of the different methods not only helps to ensure a good design solution but also helps to work more agile within a project team. The here proposed approach is one part of a holistic product design and development process for changeable production units – called Adapt! – and is described within a use case in the automotive sector.
© The authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.