Issue |
MATEC Web Conf.
Volume 112, 2017
21st Innovative Manufacturing Engineering & Energy International Conference – IManE&E 2017
|
|
---|---|---|
Article Number | 05004 | |
Number of page(s) | 6 | |
Section | Flexible Manufacturing, Automation and Robotics in Technological Processes | |
DOI | https://doi.org/10.1051/matecconf/201711205004 | |
Published online | 03 July 2017 |
The network control system of high-bay warehouse
Silesian University of Technology, Faculty of Mechanical Engineering, Institute of Engineering Processes Automation and Integrated Manufacturing Systems, Konarskiego 18A, 44-100 Gliwice, Poland
* Corresponding author: andrzej.wrobel@polsl.pl
Presentation of developing a method of automation of the storage process using electric drives with frequency converters, logic control and communication in industrial networks was the main purpose of this article. A connection structure was proposed to exchange information between devices that are part of a high-storage warehouse. It was assumed that modern communication protocols are used to synchronize the drives and to create a central control and information center in the PLC. The results of theoretical considerations were applied in practice by performing a laboratory model of a high storage warehouse with a developed automatic control system. Benefits of the proposed solutions was shown in the conclusions.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.