Issue |
MATEC Web Conf.
Volume 74, 2016
The 3rd International Conference on Mechanical Engineering Research (ICMER 2015)
|
|
---|---|---|
Article Number | 00004 | |
Number of page(s) | 7 | |
DOI | https://doi.org/10.1051/matecconf/20167400004 | |
Published online | 29 August 2016 |
Model reference control of conceptual clutched train substituted for vehicular friction clutch
Department of Aeronautical, Automotive and Ocean Engineering, Universiti Teknologi Malaysia, 81310 Johor, Malaysia
a Corresponding author: huangweiamoy@gmail.com
In order to essentially reduce heat generation and frictional dissipation carried by friction clutch engagement, conceptual design of clutched train combined with hydrostatic braking system is proposed as a novel substitution for vehicular friction clutch. Potential collateral merits of clutched train may improve service life and control accuracy since less friction heat generated during synchronization process. Parameter of clutched train is obtained by Genetic Algorithm optimization aiming at axial space-saving and light weight. Control-oriented model of proposed concept is derived and used in Model Reference Control development. Based on optimum parameter of clutched train, simulation result has shown the functionality of clutched train on vehicle standing-start, and well-behaved Model Reference Control on smoothing clutched train synchronization process.
© The Authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.