Issue |
MATEC Web Conf.
Volume 73, 2016
XV International Conference “Topical Problems of Architecture, Civil Engineering, Energy Efficiency and Ecology – 2016”
|
|
---|---|---|
Article Number | 01023 | |
Number of page(s) | 10 | |
Section | Buildings and Structures, Foundations and Underground Constructions, Bridges, Highways and Tunnels | |
DOI | https://doi.org/10.1051/matecconf/20167301023 | |
Published online | 11 August 2016 |
Moving of Inline Cleaning Units Along Submerged Crossing in Main Pipelines
Industrial University of Tyumen, 625001 Volodarskogo str. 38, Tyumen, Russia
* Corresponding author: sergey_urevih@mail.ru
The article analyzes the forces acting on the inline cleaning units of new design, operating on a bailer principle. In this case all cleaning products are collected in the internal cavity of the cleaning unit, which eliminates the formation of the ground plug and can significantly reduce the friction of the cleaning unit on the inner surface of the pipeline. The moving of the cleaning units of the given design within the space of a curved steel pipeline is investigated, the solution of the obtained equations and their analysis related to pipeline submerged crossing are shown.
© The Authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.