Issue |
MATEC Web Conf.
Volume 66, 2016
The 4th International Building Control Conference 2016 (IBCC 2016)
|
|
---|---|---|
Article Number | 00107 | |
Number of page(s) | 9 | |
DOI | https://doi.org/10.1051/matecconf/20166600107 | |
Published online | 13 July 2016 |
A Conceptual Framework of Safety and Health in Construction Management
1 Centre of Postgraduate Studies, Faculty of Architecture, Planning and Surveying, Universiti Teknologi MARA, Seri Iskandar Campus, Seri Iskandar, 32610, Perak, Malaysia
2 Department of Quantity Surveying, Faculty of Architecture, Planning and Surveying, Universiti Teknologi MARA, Seri Iskandar Campus, Seri Iskandar, 32610, Perak, Malaysia
Models to analyse and calculate the costs of prevention in the construction industry are not easy to apply in this area. Firstly, because they are based on studies carried out in the manufacturing sector; and secondly because the traditional models for analyzing these costs are limited to identifying and classifying them. This calculation models need to be improved. Hence this study is an attempt to fill the gap by develops a safety and health cost framework from pre-construction stage until to construction stage in order to assist client to allow the compliance of safety aspects in a tender document can be assured. A mixed method research will be used in this study. Semi structured interview and content analysis will be used as a main tool for the data collection. Then, the questionnaire will be distributed to the expertise in construction industry.
© Owned by the authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.