5D Building Information Modelling – A Practicability Review
1 School of the Built Environment, University of Reading Malaysia, Persiaran Graduan, Kota Ilmu, Educity, 79200 Nusajaya, Johor, Malaysia
2 Universiti Tunku Abdul Rahman, Jalan Sungai Long, Bandar Sungai Long, Cheras, 43000, Kajang, Selangor, Malaysia
a Corresponding author: x.s.lee@reading.edu.my, leexiasheng@gmail.com
Quality, time and cost are the three most important elements in any construction project. Building information that comes timely and accurately in multiple dimensions will facilitate a refined decision making process which can improve the construction quality, time and cost. 5 dimensional Building Information Modelling or 5D BIM is an emerging trend in the construction industry that integrates all the major information starting from the initial design to the final construction stage. After that, the integrated information is arranged and communicated through Virtual Design and Construction (VDC). This research is to gauge the practicability of 5D BIM with an action research type pilot study by the means of hands-on modelling of a conceptual bungalow design based on one of the most popular BIM tools. A bungalow is selected as a study subject to simulate the major stages of 5D BIM digital workflow. The whole process starts with developing drawings (2D) into digital model (3D), and is followed by the incorporation of time (4D) and cost (5D). Observations are focused on the major factors that will affect the practicability of 5D BIM, including the modelling effort, inter-operability, information output and limitations. This research concludes that 5D BIM certainly has high level practicability which further differentiates BIM from Computer Aided Design (CAD). The integration of information not only enhanced the efficiency and accuracy of process in all stages, but also enabled decision makers to have a sophisticated interpretation of information which is almost impossible with the conventional 2D CAD workflow. Although it is possible to incorporate more than 5 dimensions of information, it is foreseeable that excessive information may escalate the complexity unfavourably for BIM implementation. 5D BIM has achieved a significant level of practicability; further research should be conducted to streamline implementation. Once 5D BIM is matured and widely accepted, it is foreseeable that additional BIM dimensions of information will be incorporated into sophisticated digital building model to achieve specific project outcomes.
© Owned by the authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.