Issue |
MATEC Web Conf.
Volume 63, 2016
2016 International Conference on Mechatronics, Manufacturing and Materials Engineering (MMME 2016)
|
|
---|---|---|
Article Number | 04041 | |
Number of page(s) | 3 | |
Section | Information Technology, Control and Application | |
DOI | https://doi.org/10.1051/matecconf/20166304041 | |
Published online | 12 July 2016 |
Risk Assessment on the Transition Program for Air Traffic Control Automation System Upgrade
1 Civil Aviation Management Institute of China, 3rd Road East Huajiadi, Beijing, 100102, China
2 East China Air Traffic Management Bureau, Hongqiao Airport, Shanghai, 200335, China
a Corresponding author: lidongbin@camic.cn
We analyzed the safety risks of the transition program for Air Traffic Control (ATC) automation system upgrade by using the event tree analysis method in this paper. We decomposed the occurrence progress of the three transition phase and built the event trees corresponding to the three stages, and then we determined the probability of success of each factor and calculated probability of success of the air traffic control automation system upgrade transition. In the conclusion, we illustrate the transition program safety risk according to the results.
Key words: Air Traffic Control Automation System / Event Tree / Probability Calculation / Risk Assessment / System Upgrade Transition
© Owned by the authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.