Algorithmization of the optimization apparatus in the organization of the current planning at the companies of the building complex
Moscow State University of Civil Engineering, 129337, 26, Yaroslavskoye Shosse, Moscow, Russia
* Corresponding author: aljurgaitis@gmail.com
The issue of optimizing the decisions of the planning system at various levels and stages of construction production is one of the most important aspects of managerial and engineering activities at the construction enterprise. Such optimization is a complex multifactorial task, the solutions of which are reflected in the established documents based on the results of planning. The main document in this respect is the production and economic program (plan) developed by the planning and economic department of the corresponding construction enterprise, depending on the existing destabilizing factors and constraints established by the results of the integrated planning procedure (annual and strategic). The article discusses the concept of the annual production program of a construction company and a new approach to optimize the algorithm for distributing the resource potential between objects of the annual program.
© The Authors, published by EDP Sciences, 2019
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.