Issue |
MATEC Web Conf.
Volume 251, 2018
VI International Scientific Conference “Integration, Partnership and Innovation in Construction Science and Education” (IPICSE-2018)
|
|
---|---|---|
Article Number | 06007 | |
Number of page(s) | 6 | |
Section | Risk Management in Construction | |
DOI | https://doi.org/10.1051/matecconf/201825106007 | |
Published online | 14 December 2018 |
Simulation modeling for urban ecology maintenance of environmental comfort level – evidence from the city of Rostov-on-Don
Don State Technical University, Department of City Planning and Urban Development, 344019, Rostov-on-Don, Russia
* Corresponding author: rgsu-gsh@mail.ru
The article touches upon the issue of simulation modeling used as an instrument of managerial decision making in the field of urban planning and development. Modeling is carried out by means of modern IT in software package ESRI ArcGIS 10.1 and for the purposes of information-analytical procurement of complex improvement process and ecological reconstruction of urban territories, urban ecology decision making, and development of ecological monitoring system in urban territories. Simulation model constructed on the basis of the suggested method allows to monitor specific changes in the surveyed environment in the context of gradual implementation of complex assessment and greening activities.
© The Authors, published by EDP Sciences, 2018
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.