Grid Study of Mini Hydro Power Plant (MHPP) of Palangai Hulu 2x4,9 MW South Pesisir
1 Electrical Engineering Department, Bung Hatta University, Padang, Indonesia
2 PT. Multi Sukses Energi, Padang, Indonesia
* Corresponding author: hidayat@bunghatta.ac.id
This paper presents a gridd study of Mini Hydro Power Generation (MHPP) of Palangai Hulu, 2 x 4.9 MW. It is owned by PT. Dempo Sumber Energi (DSE) located at Palangai of South Pesisir Regency. The objective is to fulfill the legal aspects, technical aspects and economic aspects to develop of MHPP. The legal aspect is one of the requirements that must be fulfilled prior to the signing of Power Purchase Agreement (PPA) between DSE and State Electricity Company that called PLN. Technical aspect is to analyze the operational impact of the distribution system after MHPP connecting to the PLN distribution system, while the economic aspect is to analyze how much result energy of MHPP can be absorbed by PLN. Uultimately, it is described the financial feasibility of MHPP. The result is, legal aspect of development of MHPP of Palangai Hulu feasible to be continued to next process to sign contract of PPA. Technically, there is no negative impact of operating the PLN distribution system after the MHPP is connected to the PLN Rayon Balai Selasa system that analyzes using ETAP. Point of Connection (POC) as the selling point of electrical energy by DSE to the most economical PLN is on substation circuit of Balai Selasa. The energy production of MHPP Palangai Hulu can be absorbed 96.4% starting in 2018. The cost of POC is Rp. 11,577,000,000.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.