Issue |
MATEC Web Conf.
Volume 239, 2018
Siberian Transport Forum - TransSiberia 2018
|
|
---|---|---|
Article Number | 01018 | |
Number of page(s) | 6 | |
Section | Mechanical and Energy Transport Systems | |
DOI | https://doi.org/10.1051/matecconf/201823901018 | |
Published online | 27 November 2018 |
Influence of the drop-beam on the floor slab panel in the construction of waiting rooms for railway stations
Industrial University of Tyumen, Volodarskogo str.38, Tyumen, 625001, Russia
* Corresponding author: razovio@mail.ru
The aim to improve the efficiency of wooden panel houses led to a significant improvement in the design of vertical enclosure structures. However, the structure of the floor slab panel was left unchanged. The authors of this work guessed that it is possible to reduce the cost of panel-wooden individual houses without reducing the strength characteristics by increasing the efficiency of the floor structure. With this purpose, drop-beams were introduced, which proved their effectiveness by trial and error method. To determine the influence of the drop-beam on the floor structure, this article presents the calculation of the structure in the first-order approximation according to Hooke's law, and a positive effect on the panel with a span of up to six meters was revealed. Additional research is needed for the panels spanning more than six meters.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.