Issue |
MATEC Web Conf.
Volume 106, 2017
International Science Conference SPbWOSCE-2016 “SMART City”
|
|
---|---|---|
Article Number | 08001 | |
Number of page(s) | 8 | |
Section | 8 Organization and Planning of Construction Works and Municipal Facilities | |
DOI | https://doi.org/10.1051/matecconf/201710608001 | |
Published online | 23 May 2017 |
Earned value method as a tool of controlling complex engineering projects
1 Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow, 129337, Russia
2 Moscow Technological Institute, Moscow, Russia
This paper discusses the difficulty of controlling complex engineering projects with the help of the traditional control tools such as earned value method. The main problem with the controlling engineering projects is that the environment and scope of these projects are various from project to project and the project performance measurement system should adapt and flexibly reflect the variability of the engineering project scope and context. The article is based on the case study of the Russian engineering company that is needed a more flexible project performance measurement system. After the consideration of the limitations of the existing performance measurement methods and tools the authors elaborate the suggestion to improve the adaptability of the traditional earned value method which leads to better control of the engineering projects.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.