The analysis of the external factors influence on the efficiency of the absorption heat pumps inclusion in the scheme of a two-stage line installation of a STP
MATEC Web Conf., 141 (2017) 01059
Published online: 12 December 2017
DOI: 10.1051/matecconf/201714101059