Issue |
MATEC Web Conf.
Volume 295, 2019
Smart Underground Space and Infrastructures – Lille 2019
|
|
---|---|---|
Article Number | 01002 | |
Number of page(s) | 6 | |
Section | Smart Underground Space and Infrastructures | |
DOI | https://doi.org/10.1051/matecconf/201929501002 | |
Published online | 18 October 2019 |
An approach to design a distributed knowledge-based platform for energy efficient cities
1 Department of Management and Business Development, University of Ruse, Bulgaria
2 Department of Public Health and Social Activities, University of Ruse, Bulgaria
3 Department of Computer Systems&Technologies, University of Ruse, Bulgaria
In this paper is presented an approach to design distributed knowledge-based software environment for energy efficient cities. All data gathered by the smart tools at domestic or public facilities can be accessed by the platform. Energy savings can be achieved as result from an optimized mix of both condition-based and preventive energy losses services that followed an online analysis of collected data. Algorithms and methods for an intelligent interpretation of the collected data can be developed within the platform in order to monitor the energy consumption process. Simulation of different scenarios forecasting the consumer’s further behaviour in energy consumption will be the result of that intelligent interpretation.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.