Issue |
MATEC Web Conf.
Volume 292, 2019
23rd International Conference on Circuits, Systems, Communications and Computers (CSCC 2019)
|
|
---|---|---|
Article Number | 01055 | |
Number of page(s) | 4 | |
Section | Circuits and Systems | |
DOI | https://doi.org/10.1051/matecconf/201929201055 | |
Published online | 24 September 2019 |
Case study: Optimization of production processes
1 Tomas Bata University in Zlín, Faculty of Logistics and Crisis Management, Studentské náměstí 1532, 686 01 Uherské Hradiště
2 Tomas Bata University in Zlín, Faculty of Management and Economics, Mostní 5139, 760 01 Zlín
* Corresponding author: viskup@utb.cz
This article is intended to introduce the reader to the basic ways of increasing the efficiency of current production when problems arise from inaccurate planning of production. The article is based on a study that is gradually implemented as system measures in actual production. Simple and logical improvements bring efficiency improvements and production deadlines. The methods used are suitable for both production and logistics. The study is for a medium-sized company. But the authors want to extend it to small businesses. Small businesses do not fully perceive this area, nor do they accept problems in this area. As part of consultations and inspections, we find that small businesses have significant systemic shortcomings, but owners do not admit this.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.