Construction delay of a penstock
1 Rockgro, Po Box 11-9054, Beirut, Lebanon
2 LU, Dept of Civil Engineering, Faculty of Technology and Doctoral School of Science and Technology, Lebanon
* Corresponding author: info@rockgro.com
Uncertainties are not always quantifiable and particularly those that result from a poor management. This is the case of the construction of a penstock of a hydroelectric project. The penstock is an assembly of imbricated cylindrical blocks. The steel blocks deformed during transportation and storage. Plastic deformations and buckling are undesired effects or the blocks have to be replaced. A back analysis was made considering many different transport and storage cases. The case where the blocks were laid on a rigid ground without prevention or protection is examined with an analytic model. This is followed by an analysis of the state of stresses and a validation of the model.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.