Issue |
MATEC Web Conf.
Volume 279, 2019
10th International Scientific Conference Building Defects (Building Defects 2018)
|
|
---|---|---|
Article Number | 01007 | |
Number of page(s) | 11 | |
Section | Building Information Modeling (BIM) | |
DOI | https://doi.org/10.1051/matecconf/201927901007 | |
Published online | 12 April 2019 |
Building defects as a result of non-conceptual design
Faculty of Technology, The Institute of Technology and Business, Okružní 517/10, 370 01 České Budějovice, Czech Republic
Corresponding author: lojda@mail.vstecb.cz
The contribution deals, describes and analyzes the fundamental connection between defects and the design of a building. Approximately half of the faults occur in building objects due to incorrect or faulty design activities. The non-conceptual approach to managing building preparation and insufficient and unqualified project design control poses problems with building use and increases the cost of maintenance. Improving engineering design and a comprehensive approach to project preparation and preparation is a way to increase the quality of design work. In his contribution, the author relies on quality management systems and their implementation in design offices and companies. At the same time, the term is a complex project, which would be a control tool for the quality of projection work.
© The Authors, published by EDP Sciences, 2019
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.