Issue |
MATEC Web Conf.
Volume 199, 2018
International Conference on Concrete Repair, Rehabilitation and Retrofitting (ICCRRR 2018)
|
|
---|---|---|
Article Number | 11007 | |
Number of page(s) | 7 | |
Section | Concrete Materials Technology | |
DOI | https://doi.org/10.1051/matecconf/201819911007 | |
Published online | 31 October 2018 |
Pullout simulation of post installed chemically bonded anchors in UHPFRC
Univ Lyon, INSA-Lyon, GEOMAS, F-69621, France
* Corresponding author: fabien.delhomme@insa-lyon.fr
An experimental and numerical study was completed in order to examine the mechanical behaviour of post-installed bonded anchors in ultra-high performance fibre reinforced concrete with a compressive strength higher than 130 MPa. The aim was to analyse the failure mechanisms in static pullout tests and to suggest a simple numerical model, which can be employed in a design stage, to reproduce the global behaviour of the anchor. The experimental observations show that a combined pullout and concrete cone failure occurred for an embedment depth of 40 mm and a steel rod failure for an embedment depth of 100 mm. The numerical model was set up using Abaqus software, by adopting the concrete damage plastic model and a surface-based cohesive behaviour for the interface concrete-anchor. The obtained failure modes and ultimate loads are in good agreement with experimental results. A minimum embedment depth of 50 mm was assessed to prevent a pullout failure of the anchor.
© The Authors, published by EDP Sciences, 2018
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.