Issue |
MATEC Web Conf.
Volume 147, 2018
The Third International Conference on Sustainable Infrastructure and Built Environment (SIBE 2017)
|
|
---|---|---|
Article Number | 05004 | |
Number of page(s) | 11 | |
Section | Ocean and Marine Engineering | |
DOI | https://doi.org/10.1051/matecconf/201814705004 | |
Published online | 22 January 2018 |
Efficiency Comparison between Conventional and Modern Port Operation System for Small-Scale Dry Bulk Cargo
Institut Teknologi Bandung, Jalan Ganesha No. 10 Bandung, Indonesia
* Corresponding author: auliauliatiara@gmail.com
Since the launching of Sea Toll Road Program in 2015, the improvement in ports’ operation systems has become Indonesia’s foremost necessity. This improvement commonly leads to equipment modernization, while realistically, modern equipment does not always amount to a productive performance, especially in the context of small-scale ports. Instead, it is prone to creating wasteful capital and maintenance cost as well as making the planning time ineffective. This study compares two options of port operation systems in a small port, which is conventional and technologically-advanced method for dry bulk cargo. It results in thin gaps between each option’s financial assessment variables, which are Internal Rate of Return, Benefit/Cost Ratio and Payback Period, regardless of a stark difference between each option’s equipment cost. This study concludes that with the right approach, the conventional operation system is still the most efficient option compared to its contemporary opposite.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.