Research on Interactive Control of Electrolytic Aluminum Load and Wind Power Output
1 Hohai University, College of Energy and Electrical Engineering, 210098 Nanjing, China
2 Jiangsu Engineering Research Center for Distribution & Utilization and Energy Efficiency, 210098 Nanjing, China
With the large-scale wind power generation connected to Gansu power grid, electrolytic aluminium load has reached a certain scale at the same time, the vast majority of electrolytic aluminium load directly connects to power grid using 330kV transmission line. According to the physical characteristics and historical data, the continuous adjustment characteristic of electrolytic aluminium load is analysed. Based on this characteristic, a mathematical model for the electrolytic aluminium load is established. Aiming at reducing power network loss and wind power consumption, an optimization model based on the load regulation characteristics of electrolytic aluminium is constructed, which is optimized by particle swarm optimization algorithm. Based on the case data of Gansu power grid, the optimal method based on the load regulation characteristics of electrolytic aluminium is analysed and its feasibility is verified.
© The Authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.