Open Access
MATEC Web of Conferences
Volume 31, 2015
2015 7th International Conference on Mechanical and Electronics Engineering (ICMEE 2015)
Article Number 13004
Number of page(s) 4
Section Geological and geotechnical engineering
Published online 23 November 2015
  1. Royle, A G, 1979. Estimating small blocks of ore, how to do it with confidence, World Mining, April.
  2. Stephenson, P R and Vann, J. Commonsense and good communication in mineral resource and ore reserve estimation, in Mineral Resource and Ore Reserve Estimation – The AusIMM Guide to Good Practice, Monograph 23 (Ed Edwards, A C), 2000, pp 13–20 (The Australasian Institute of Mining and Metallurgy: Melbourne).
  3. Coombes, J, Thomas, G S, Gifford, M and Jepsen, L. Assessing the risk of incorrect prediction – a nickel/cobalt case study, in Proceedings Mine to Mill, 1998 pp 63–68 (The Australasian Institute of Mining and Metallurgy: Melbourne) .
  4. Glacken, I M. Change of support and use of economic parameters in block selection, in Geostatistics Wollongong 96 (Eds: Baafi, E Y and Schofield, N A), 1997, pp 811–821. [CrossRef]
  5. Nielsen, K I and Currie, D A. The discovery of the Just In Case/Wallaby gold deposit, Laverton District, Western Australia, in Proceedings New Generation Gold Mines ‘99 Conference, November, 1999, pp 1–13.
  6. Shaw, W J and Khosrowshahi, S. Grade control sampling and ore blocking: Optimization based on Conditional simulation, in Proceedings Third International Mining Geology Conference, 1997, pp 131–134 (The Australasian Institute of Mining and Metallurgy Melbourne).