Analysis of Limiting Measures of Three-phase Short-circuit Current of 500kV Intensive Receiving-end Power Grid in the Early Stage of UHV Construction
MATEC Web Conf., 63 (2016) 01039
Published online: 12 July 2016
DOI: 10.1051/matecconf/20166301039