The citing articles come from EDP Sciences database, as well as other publishers participating in CrossRef Cited-by Linking Program. You can set up your personal account to receive an email alert each time this article is cited by a new article (see the menu on the right-hand side of the abstract page).

Cited article:

Prioritizing the key causes of construction project delay in different countries: a cross-sectional analysis of different project types

Faranak Zagia, Stephen Kajewski, Sara Omrani and Omid Motamedisedeh
International Journal of Construction Management 26 (9) 1879 (2026)
https://doi.org/10.1080/15623599.2025.2568103

Analyzing Causes of Delays in Highway Construction Projects: A Case Study of Pakistan

Amer Yaqub, Muzna Anam, Muhammad Umar, Muhammad Abdullah and Mehtab Alam
Transportation Research Record: Journal of the Transportation Research Board 2680 (2) 877 (2026)
https://doi.org/10.1177/03611981251368319

A Land Readiness Index (LRI) for Pre-Contract Risk Assessment in Mega Construction Projects: Evidence from Iraq

Hamzah Hamzah Noori and Abbas M. Burhan
IOP Conference Series: Earth and Environmental Science 1644 (1) 012088 (2026)
https://doi.org/10.1088/1755-1315/1644/1/012088

Enhancing project portfolio selection for construction holding firms: a multi-objective optimization framework with risk analysis

Milad Ghanbari, Asaad Azeez Jaber Olaikhan and Martin Skitmore
Engineering, Construction and Architectural Management 32 (8) 5534 (2025)
https://doi.org/10.1108/ECAM-05-2023-0532

Investigating the Causal Factors Contributing to Slow Site Clearance and Their Effects on Road Construction Costs and Timelines

Ha Duy Khanh
Public Works Management & Policy 30 (4) 432 (2025)
https://doi.org/10.1177/1087724X251341920

Exploring Critical Factors Affecting Delay in Construction Projects in Iraq: A review

Ali Hashim Yas Hashim Yas, Mohammed Naji Hammood Naji Hammood and Haider H. Algreety H. Algreety
Kerbala Journal for Engineering Sciences 5 (4) 140 (2025)
https://doi.org/10.63463/kjes.1196

Construction projects: interactions of the causes of delays

Mahesh Babu Purushothaman, Leo Neil Resurreccion San Pedro and Ali GhaffarianHoseini
Smart and Sustainable Built Environment (2024)
https://doi.org/10.1108/SASBE-11-2023-0334

Teaching self-criticism and peer-critique skills to engineering students through a temporal survey-based program

Víctor Revilla-Cuesta, Nerea Hurtado-Alonso, Ignacio Fontaneda, Marta Skaf and Vanesa Ortega-López
Frontiers in Education 9 (2024)
https://doi.org/10.3389/feduc.2024.1399750

In-depth analysis of critical factors affecting Iraqi construction projects performance

Safaa Mohammed and Afrah Hasan
Open Engineering 14 (1) (2024)
https://doi.org/10.1515/eng-2024-0006

Study the delays and conflicts for construction projects and their mutual relationship: A review

Junaid Tariq and S. Shujaa Safdar Gardezi
Ain Shams Engineering Journal 14 (1) 101815 (2023)
https://doi.org/10.1016/j.asej.2022.101815

Effects of critical success factors, BIM implementation strategies, and barriers on employer-initiated delays

Mohammad Barqawi, Heap-Yih Chong and Robert Lopez
International Journal of Construction Management 23 (16) 2788 (2023)
https://doi.org/10.1080/15623599.2022.2097041

Educating Future Agricultural Engineers at the University of Burgos, Spain, through a Service-Learning Project on Rural Depopulation and Its Social Consequences

Víctor Revilla-Cuesta, Marta Skaf, Javier Manso-Morato, José T. San-José and Vanesa Ortega-López
Education Sciences 13 (3) 267 (2023)
https://doi.org/10.3390/educsci13030267

Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand

Mahesh Babu Purushothaman and Sumit Kumar
Smart and Sustainable Built Environment 11 (2) 294 (2022)
https://doi.org/10.1108/SASBE-08-2021-0145

Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects

Darío Collado-Mariscal, Juan Pedro Cortés-Pérez, Alfonso Cortés-Pérez and Antonia Cuevas-Murillo
International Journal of Environmental Research and Public Health 19 (20) 13064 (2022)
https://doi.org/10.3390/ijerph192013064

A Review of Employer‐Caused Delay Factors in Traditional and Building Information Modeling (BIM)‐Enabled Projects: Research Framework

Mohammad Barqawi, Heap-Yih Chong, Emil Jonescu and Yinshan Tang
Advances in Civil Engineering 2021 (1) (2021)
https://doi.org/10.1155/2021/6696203