The citing articles come from EDP Sciences database, as well as other publishers participating in CrossRef Cited-by Linking Program. You can set up your personal account to receive an email alert each time this article is cited by a new article (see the menu on the right-hand side of the abstract page).

Cited article:

Sensitivity Analysis of Key Cost Performance Determinants Using Extreme Bound Analysis Method

Sharareh Kermanshachi and Apurva Pamidimukkala
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 15 (1) (2023)
https://doi.org/10.1061/(ASCE)LA.1943-4170.0000570

Robustness Analysis of Total Project Cost and Schedule Delay and Overrun Indicators of Heavy Industrial Projects

Sharareh Kermanshachi and Apurva Pamidimukkala
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 15 (2) (2023)
https://doi.org/10.1061/JLADAH.LADR-942

UNRAVELLING EFFECTS OF PROJECT COMPLEXITY ON PROJECT SUCCESS AND PROJECT MANAGEMENT SUCCESS: A META-ANALYTIC REVIEW

Zhibin Hu, Guangdong Wu, Junwei Zheng, Xianbo Zhao and Jian Zuo
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 29 (6) 542 (2023)
https://doi.org/10.3846/jcem.2023.19553

Evaluation of factors contributing to the failure of information systems in public universities: The case of Iran

Siamak Kheybari, Fariba Mahdi Rezaie, S. Ali Naji, Mahsa Javdanmehr and Jafar Rezaei
Information Systems 92 101534 (2020)
https://doi.org/10.1016/j.is.2020.101534

Application of Delphi Method in Identifying, Ranking, and Weighting Project Complexity Indicators for Construction Projects

Sharareh Kermanshachi, Behzad Rouhanizadeh and Bac Dao
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 12 (1) (2020)
https://doi.org/10.1061/(ASCE)LA.1943-4170.0000338

User Story Estimation Based on the Complexity Decomposition Using Bayesian Networks

M. Durán, R. Juárez-Ramírez, S. Jiménez and C. Tona
Programming and Computer Software 46 (8) 569 (2020)
https://doi.org/10.1134/S0361768820080095

Gap Analysis in Cost Estimation, Risk Analysis, and Contingency Computation of Transportation Infrastructure Projects: A Guide to Resource and Policy–Based Strategy Establishment

Sharareh Kermanshachi and Elnaz Safapour
Practice Periodical on Structural Design and Construction 25 (1) (2020)
https://doi.org/10.1061/(ASCE)SC.1943-5576.0000460

An interdisciplinary perspective of conflict and relationships in construction procurement and logistics

Mostafa Jelodar, Andries van Heerden and Gregory Chawynski
International Journal of Construction Supply Chain Management 10 (1) 30 (2020)
https://doi.org/10.14424/ijcscm100120-30-45

Empirical Analysis of a Management Function’s Failures in Construction Project Delay

Luong Hai Nguyen
Journal of Open Innovation: Technology, Market, and Complexity 6 (2) 26 (2020)
https://doi.org/10.3390/joitmc6020026

IDENTIFICATION AND QUANTIFICATION OF PROJECT COMPLEXITY FROM PERSPECTIVE OF PRIMARY STAKEHOLDERS IN US CONSTRUCTION PROJECTS

Sharareh Kermanshachi and Elnaz Safapour
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 25 (4) 380 (2019)
https://doi.org/10.3846/jcem.2019.8633