Open Access
MATEC Web Conf.
Volume 66, 2016
The 4th International Building Control Conference 2016 (IBCC 2016)
Article Number 00105
Number of page(s) 6
Published online 13 July 2016
  1. ILO: (2008),
  2. OECD Environmental Outlook, OECD, Paris, France.
  3. KleindorferP., OktemU., PariyaniA. and SeiderW. (2012). Assessment of catastrophe risk and potential losses in industry. Computers & Chemical Engineering, 47, pp.85–96. [CrossRef]
  4. KonstandinidouM., NivolianitouZ., MarkatosN. And KiranoudisC. (2006). Statistical analysis of incidents reported in the Greek Petrochemical Industry for the period 1997—2003. Journal of Hazardous Materials, 135(1-3), pp.1–9. [CrossRef]
  5. KossorisM. (1939).A Statistical Approach to Accident Prevention.Journal of the American Statistical Association, 34(207), pp.524–532. [CrossRef]
  6. COOKEW. and GAUTSCHIF. (1981).OSHA, Plant Safety Programs, and Injury Reduction.Industrial Relations, 20(3), pp. 245–257.
  7. MajidM. and McCafferR. (1997).Assessment of Work Performance of Maintenance Contractors in Saudi Arabia. J. Manage. Eng., 13(5), pp. 91–91. [CrossRef]
  8. VerbanoC., VenturiniK., (2013), “Managing Risks in SMEs: A Literature Review and Research Agenda”, Journal of Technology Management & Innovation 8(3), 1–17.