Open Access
MATEC Web of Conferences
Volume 47, 2016
The 3rd International Conference on Civil and Environmental Engineering for Sustainability (IConCEES 2015)
Article Number 04019
Number of page(s) 4
Section Building Environment, Architecture and Construction
Published online 01 April 2016
  1. CIDB, IBS Roadmap 2003–2010, Construction Industry Development Board Malaysia, Kuala Lumpur, (2003).
  2. W. Pan, A.G.F Gibb and A.R.J. Dainty, Strategies for integrating the use of offsite production technologies in housebuilding, Journal of Construction Engineering and Management, 138(11), 1331-1340, (2012). [CrossRef]
  3. L.S. Peng and C.J. Chuan, a study of the readiness of precasters in just in time construction work study, International Journal of Productivity and Performance Management, 50(4), 131-140, (2001).
  4. M. Oostra and C. Claeson-Jonsson, Best Practices: Lesson Learnedon Building Concept in Open Building Manufacturing- Core Concept and Industrial Requirement, TNO Bouw , Delft, (2007)
  5. CIDB, Malaysian Construction Outlook 2007, Construction Industry Development Board Malaysia, Kuala Lumpur, (2007).
  6. N. Blismas and R. Wakefield, Drivers, constraints and the future of offsite manufacture in Australia, Construction Innovation, 9(1), 72-83, (2009). [CrossRef]
  7. CIDB, IBS Roadmap 2003–2010, Construction Industry Development Board Malaysia, Kuala Lumpur, (2003).
  8. Z.A. Hamid, K.A.M. Kamar, M.Z.M. Zain, M.K. Ghani and A.H.A. Rahim, Industrialised building system (IBS) in Malaysia: The current state and R&D initiatives, Malaysian Construction Research Journal, 2(1), 1–11, (2008).
  9. CIDB, The current state of industrialised building system (IBS) construction forward, Proceedings of the 1st IBS Roundtable Workshop, Kuala Lumpur, (2011).
  10. M.N.M. Nawi, A. Lee and K.M. Nor, Barriers to implementation of the industrialised building system ( IBS ) in Malaysia, The Built and Human Environment Review, 4, 22-35, (2011).
  11. E.C.W. Lou and K.A.M Kamar, Industrialized building systems: Strategic outlook for manufactured construction in Malaysia, Journal of Architectural Engineering, 18(2), 69-74, (2012). [CrossRef]
  12. I.L. Jabar, F. Ismail, A.A. Mustafa, Issues in managing construction phase of IBS projects. Procedia - Social and Behavioral Sciences, 101, 81–89, (2013). [CrossRef]
  13. F. Ismail, N.M. Yusuwan, H.E.A. Baharuddin, Management factors for successful IBS projects implementation, Procedia - Social and Behavioral Sciences, 68, 99–107, (2012). [CrossRef]
  14. A.B.A. Rahman and W. Omar, Issues and challenges in the implementation of industrialised building systems in Malaysia, Proceedings of the 6th Asia-Pacific structural Engineering and Construction Conference, Kuala Lumpur, (2006).