Open Access
MATEC Web of Conferences
Volume 13, 2014
ICPER 2014 - 4th International Conference on Production, Energy and Reliability
Article Number 05002
Number of page(s) 5
Section Plant Integrity and Reliability
Published online 17 July 2014
  1. Willis, H. L. and Scott, W. G., Distributed Power Generation, Planning and Evaluation. Marcel Dekker, Inc., New York, (2000). [CrossRef]
  2. Kooten, G. C., and Wong, L., Economics of wind power when national grids are unavailable. Energy Policy 38:p. 1991–1998(2010). [CrossRef]
  3. Bridgwater A. V., Toft A. J. and Brammer J. G., A techno-economic comparison of power production by biomass fast pyrolysis with gasification and combustion. Renewable & Sustainable Energy Reviews 6:p. 181–248(2002). [CrossRef]
  4. Steer, S.J, Nuttall, W.J., Parks, J.T., and Goncalves L.V.N, Predicting the contractual cost of unplanned shutdowns of power stations: An accelerator- driven sub critical reactor case study. Electric Power Systems Research 81: p. 1662–1671 (2011). [CrossRef]
  5. Dieter, G. E, and Schmidt, L. C. Engineering Design, 5th Edition, Int. Edition. McGraw Hill, Singapore, (2013).
  6. Heizer, J., and Render, B. Operations management. 10th Edition. Pearson Higher, (2010).
  7. Sullivan, Wicks, Koelling. Engineering Economy. 15th Edition, International Edition, Pearson Education Ltd., (2012).
  8. Farik Zolkepli, TNB targets improving on power outage index. NATION, (Sat. June 1, 2013)
  9. TNB, Maximum Demand ,, retrieved on (15th Jan 2014).
  10. Suhala, S., Customised Contract Hume, Cogen UTP, TIK General-Medium Voltage Peak/Off Peak Commercial Bulk Supply Tariff. e-mail from Suhala Sukarno to Azanin Bismi A., Cheah P.W, (15th January 2014).